Top 10 problems and
associated solutions





     No Build Alternative
    images-1.jpeg
    By: Metro on April 05, 2014

    The No Build Alternative includes all of the projects that are identified in the financially constrained project list of SCAG’s 2008 Regional Transportation Plan (RTP): Making the Connections. The No Build Alternative also includes currently planned projects in Los Angeles County that are identified in Measure R, as well as those in the “Constrained Plan” of Metro’s 2009 Long Range Transportation Plan (through the year 2035). The No Build Alternative does not include any project in the SR 710 corridor in the study area. 


-10 Points
0% Support
100% Oppose

Support

Oppose

blue_abstract_widescreen-wide.jpg
Jun, 03 2013 10:46
They do need to do something. A no build only prolongs the problem